Establish strategic stockpiling and spare-sharing arrangements for critical components with long lead times

Large transformers take years to replace, so sharing stockpiles and spares across grid companies protects security and resilience.

About this measure

Establish programmes for the strategic stockpiling and sharing of critical grid components. This is particularly valuable for components like large transformers, whose multi-year lead times make emergency replacement through normal procurement impractical. Programmes can operate at a national or regional level, with costs shared across participating grid companies. Pooled approaches that spread the cost and raise the chance of a match between available spares and specific needs are usually more economical. Stockpiling should be complemented by condition monitoring and predictive maintenance that extend equipment life and give early warning of failure. Implementation requires agreement on cost-sharing formulae, safe storage locations that have proper preservation conditions, emergency access protocols and standardisation of specifications to maximise interchangeability. It also requires regulation to allow stockpiling costs in the regulated asset base. For emerging economies with smaller systems, regional pooling through power pools or regional economic communities can be a practical route. The measure mainly serves security and resilience rather than day-to-day deployment speed.

Core recommendation for this measure

Deploy

3.3 Strengthen supply chains


Lead times and prices for key pieces of grid equipment have risen sharply, constraining deployment.…

Related recommendations

Plan

2.3 Integrate across borders


Coordinate grid planning across borders and jurisdictions to ensure that interconnection needs and…

Operate

5.1 Operate the bulk system flexibly and securely


The bulk system faces change from both the supply and the demand side. Variable renewables are…