Why this objective matters
Grid investment needs to increase substantially to support the energy transition and power economic growth; planning will determine whether that investment flows to the right places.
Grid planning in many systems is still based on extrapolating past demand and planning generation, transmission and distribution in isolation from one another. As renewables, distributed energy resources and electrification grow, this approach typically results in grids that are built too late and sized for the wrong future. This delays the connection of new supply and demand, leaves domestic renewables underused and ultimately raises costs for consumers. Grid planning should anticipate system needs, commit investment ahead of demand and weigh up alternatives before immediately opting for reinforcement.
Practices for grid planning, and wider power and energy system planning, have not kept pace with the changes they need to accommodate.
Plans are still commonly developed by extrapolating historical demand growth, led by decisions on centralised generation and prepared separately for transmission and distribution. These methods were adequate when most supply was dispatchable, demand was predictable and power flowed one way.
They are poorly suited to a system in which variable renewables, distributed energy resources and the electrification of industry, transport and buildings are reshaping foundational planning and operational assumptions, including the level of demand growth and the availability of demand-side flexibility.
Poor planning misses faster and cheaper alternatives and can lock systems into sub-optimal pathways for years or decades.
Where renewable connections wait, domestically generated solar and wind cannot displace fossil fuel imports, and curtailment and congestion costs rise and are passed on to consumers. Where the grid cannot accommodate new demand, electrification projects stall and another cycle of investment in fossil-fuelled alternatives is locked in, which weakens national competitiveness and further prolongs dependence on imported fuels. And where planning ignores flexibility and other alternatives in favour of conventional grid reinforcement, systems build grid capacity that faster and cheaper options could have deferred or avoided, adding to connection times and consumer costs. Planning reform is urgent. Grid infrastructure is subject to lead times of 5–15 years to plan, permit and build, while renewable supply, storage and electrified demand need only 1–5 years. This means that the planning decisions taken now set the constraints the system will operate under for years to come.
What’s at stake
Security
Modern grid planning allows countries to integrate national renewable resources reliably and cost-effectively. This supports self-reliance and reduces exposure to fossil fuel price volatility and supply shocks. Planning for resilience also helps systems withstand extreme weather and other disruptions, increasingly critical as end-use electrification becomes more widespread.
Competitiveness
Renewables and batteries are now often the fastest and cheapest source of new supply. Planning that anticipates future needs, and leverages these and other alternatives to conventional generation and grid reinforcement, lowers costs and enables timely connections for new demand, such as data centres and electrifying industry.
Affordability
How grids are planned today shapes consumer bills for decades. Building capacity to meet future need, valuing wider system benefits and choosing flexibility over reinforcement where it is cheaper all reduce the total cost to be recovered from consumers.
What this objective calls for
Grid planning has to be reformed along three linked dimensions: how plans are made, when investment can be committed, and what solutions are considered to meet an identified need. Together these reforms move planning from a reactive, wires-first exercise to an anticipatory one that selects the right solution at the right time. Taking each dimension in turn: