Why this recommendation matters
Planning for end-use sectors has traditionally been conducted by separate ministries, with little need to coordinate. Electrification blurs those boundaries. Industry, transport and buildings are now closely linked to the power sector through industrial electrification, electric transport charging infrastructure and buildings-related equipment such as air conditioners and heat pumps. This reshapes demand in ways that cut across sectoral plans. Electrification also rearranges the relationship between energy vectors: for example, as the role of fossil gas in heating declines, district heating and waste heat grow, with consequences for the gas, heat and electricity grids. Planned in isolation, each sector and each vector optimises for itself, leading to missed synergies and unsuited grid infrastructure.
The electricity grid has to be planned for the energy system as a whole. A growing number of jurisdictions now regulate several sectors in a single package. For example, policies mandating solar panels or electric heating in buildings can require parking cabling for future EV charging at the same time. In planning, the interactions between sectors should be mapped and built into modelling, and planners should identify the energy and infrastructure needs of economic development, from industrial policy and special economic zones to port and freight electrification, so that demand driven by economic activity can be anticipated.
Energy system planners should have integrated energy-system modelling capabilities that incorporate sectors and vectors, underpinned by shared data platforms to ensure that everyone works from consistent inputs and assumptions. Grid planning should treat demand-side plans as key inputs, modelling the needs and potential services of each where necessary.
Joint planning across sectors and vectors lowers total infrastructure costs and helps each sector electrify on schedule. It removes the waste of electrifying part of a building or site and returning later to complete it. It also gives each sector earlier certainty about when and where connections will be available, which helps to keep electrification investment on track. It strengthens security by making sector coupling usable as a system resource: for example, industrial clusters that produce, store and consume electricity, heat and hydrogen together can offer flexibility that single-sector planning overlooks, potentially by converting surplus renewable power into stored heat and lowering their electricity demand at other times.
How to act on this recommendation
Stage 1
Build a shared understanding across sectors first, by identifying the opportunities for coordination and joint electrification.
This begins with convening the key stakeholders, including grid operators, policymakers and representatives from the industrial, transport and buildings sector, to foster collaboration and align perspectives. Integrated thinking for the broader energy network starts with coordination across departments of the regulators that handle electricity, gas, heat and hydrogen, and a shared understanding in government of the implications of decarbonising energy infrastructure. A critical task at this stage is collecting the relevant data, which may require generating new datasets where gaps exist. Through analysis of this data, stakeholders can identify patterns, overlaps and opportunities for efficiency gains, forming the foundation for coordinated planning.
Stage 2
Translate the identified synergies into joint modelling and planning.
This means adopting cross-sector energy-system modelling tools and shared planning platforms that represent sectors and vectors together, and aligning grid planning with sectoral electrification roadmaps so that grid and demand-side plans advance together. Identify and apply flexibility solutions across sectors at this stage. These reforms connect to the modern planning methods in recommendation 1.1 and to the data governance in recommendation 7.3.
Stage 3
Carry modelling and planning capabilities into common regulatory frameworks.
This can realise the full potential of industrial sector coupling as a system resource: clusters managing electricity, heat and hydrogen together can offer flexibility services across timescales. It requires grid planning to have anticipated the infrastructure needs of multi-energy industrial hubs, and the regulation of electricity, gas and hydrogen to actively enable sector coupling, which links closely to the governance reforms in objective 7.
Core measures
Implementation considerations
Cross-sector planning brings together actors who are often not used to working with one another. The industrial, transport and buildings sectors operate with different terminologies, planning horizons and data practices, and significant differences exist within sectors, particularly across industrial players. These differences, compounded by a reluctance to share data that is seen as commercially sensitive or constrained by regulation, can slow collaboration. Overcoming them requires deliberate effort to harmonise approaches, establish common frameworks and build trust among stakeholders. Planning should also take a comprehensive view of all sectors, from large, concentrated loads such as data centres to distributed but fast-growing demand such as charging hubs, so that no significant source of future demand or flexibility is overlooked.
Integrating planning across vectors changes how infrastructure costs are recovered and allocated, and the tariff design that follows can fall unevenly on households. Assess the effect of evolving tariffs and electrification costs on vulnerable households directly, particularly as buildings electrification reshapes demand. Care is also needed to ensure that integrated planning does not default to the best-resourced sectors or regions, and that the efficiencies it unlocks are shared rather than captured where coordination is easiest.