Why this recommendation matters
Traditionally, grids have been developed to connect domestic fossil-fuel or nuclear power plants with consumers. As the share of variable renewable generation grows, these new sources have to be accompanied by an increase in system flexibility, which can come from both demand resources and energy storage. Achieving this in a smaller geography, or in one with undiversified renewable potential, can become operationally challenging and costly. The growth in electricity demand that comes with economic development and electrification heightens the challenge.
A wider resource base allows complementary supply and demand patterns to be exploited. Solar and wind output can vary significantly across a large area, demand peaks can occur at different times in neighbouring systems, and dispatchable supply and storage resources can be shared, all reducing the need to retain dispatchable fossil-fuelled capacity. Integrating grids across jurisdictions is the geographic and governance dimension of grid integration, alongside integration across voltage levels and across energy vectors.
The benefits of integrating grids across jurisdictions can only be fully reaped if it is paired with the deeper integration of markets and procurement frameworks; physical interconnection on its own secures only contingency benefits, while integrated markets can unlock the full value of having a wider resource base.
Cross-border integration improves security, competitiveness and affordability together. Stronger cross-border connections also improve energy security, as supply abroad can help keep the lights on when domestic supply is interrupted. Larger market areas tend to absorb higher shares of variable renewables, which can accelerate their deployment. Where interconnection is accompanied by market integration, drawing a larger share of low-marginal-cost renewables into a shared market can lower overall power costs, an effect reinforced by the reduced use of expensive peak capacity that integration also brings. Lower electricity costs in turn can make electrification more attractive, which advances the decarbonisation of the wider economy.
How to act on this recommendation
Stage 1
The first interconnectors are built between countries, mainly for security of supply.
In the initial stages, the interconnectors are at first used for contingency and then to facilitate trade, with a separate process allocating interconnector capacity. The main value at this stage is security of supply. Policymakers should develop a joint cross-geography grid roadmap and establish standing regional coordination mechanisms that bring national planners, regulators and ministries together. This coordination should take in consideration electrification potential for cross-border transport corridors, involving freight and logistics companies alongside grid planners, and should connect to the transition and cross-sectoral planning of the other recommendations in this objective. Trust between stakeholders is strengthened by greater transparency, addressed in recommendation 7.1.
Stage 2
Integration then deepens across planning, operations and markets.
Countries gradually integrate their markets across timeframes – day-ahead, intraday and balancing – harmonise their grid codes, and build regional scenarios connected to the climate and energy plans, as set out in recommendation 2.1. Joint scenario building and grid planning require data transparency and the transfer of certain mandates to associations of national actors (again see recommendation 7.1). While national grids remain under national control, the governance of interconnectors, including how project costs are shared, moves to newly established regional bodies. Governments should therefore agree cross-geography cost–benefit-sharing frameworks and plan joint cross-border grid infrastructure projects. Not only is this key for electricity market integration and power security, but also to enable cross-jurisdiction market participation. It can also benefit industrial clusters operating in border regions, which could then make the most of access to power generated in neighbouring jurisdictions.
Stage 3
Operate and dispatch a fully integrated cross-border market.
In the last stage of integration, a wider area spanning several countries operates as a single market, with dispatch organised centrally and the transmission grid governed by a regional independent system operator. Transmission planning is conducted for the whole region, integrated with gas and hydrogen transmission planning as set out in recommendation 2.2. Governance of the regional grid is vested not in individual countries, but in regional entities such as the system operator and regional regulatory bodies, which links to recommendation 7.2.
Core measures
Implementation considerations
Drawing on the cheapest available resource across a wider area lowers average prices for consumers in the region, but it also redistributes value in ways that generate resistance. A new or expanded interconnector tends to lower prices in the importing system and raise them in the exporting one, leaving importing consumers better off and exporting producers worse off. Transmission companies that collect congestion rent at a border have an inherent incentive to maintain that congestion, particularly when privately owned, and the problem deepens where the transmission company and incumbent fossil generators are not unbundled, since neither then has an interest in expanding cross-border capacity. The overall efficiency gain is real and large enough to compensate those who lose, but designing an equitable and workable compensation scheme is difficult.
The equity questions are largely distributional and cross-jurisdictional. Benefits accrue unevenly between countries and between consumers and producers within them, and significant value can flow to transit states that have little incentive to invest in capacity at their own borders. Cost–benefit-sharing frameworks should therefore be agreed transparently and in advance, ideally with an impartial regional institution coordinating the allocation, and should account for the full range of effects rather than defaulting to simple equal or distance-based splits that overlook where benefits fall.