Enable

Introduce output- and performance-based revenue regulation

Revenue tied to outcomes such as reliability, connection speed and utilisation, with decoupling from volumes sold, turns operational reforms into sources of earnings.

About this measure

Tie grid company revenues to defined performance outcomes rather than to inputs, using metrics that reflect the outcomes the transition requires: reliability, connection speed, hosting capacity released, asset utilisation, customer service, losses and emissions. Performance incentive mechanisms attach rewards and penalties to those metrics; revenue decoupling – severing revenues from the volume of energy sold – is the baseline building block that removes the incentive to grow sales and oppose distributed resources. Output-based regulation converts the operational reforms in objective 5 and the flexibility in objective 6 from cost centres into sources of earnings. It also places greater demands on the regulator than cost-of-service regulation, making the pace of implementation dependent on recommendation 7.1. Whatever revenue regulation framework results from this measure, the targeted operational-use incentives in recommendation 5.3 apply.

Core recommendation for this measure

Enable

7.2 Revise grid company governance


The changing nature of the power system means that the tasks of the companies that plan, deploy and…

Related recommendations

Operate

5.3 Optimise the use of existing infrastructure


Grid assets and contracted generation are routinely operated below their safe technical capability,…

Enable

7.1 Strengthen oversight and transparency


The task of overseeing the power sector is changing rapidly and becoming significantly more complex…