A flexible grid

From flexibility from large power plants alone to flexibility from all resources, including demand.

The opportunity

Power systems need more flexibility while their traditional sources of it decline. Variable renewables make supply depend on the weather, with steeper ramps and more frequent periods of surplus. The large conventional plants that have provided most of the system’s balancing run fewer hours, and many will retire. Electrification raises demand and brings loads such as EV charging, air conditioning and electric heating that draw high power for short periods and can create new peaks. Meeting these needs with conventional means alone would require grid reinforcement and dispatchable capacity sized for peaks that occur for a few hours a year and used well below their capability the rest of the time. 

A flexible grid manages demand, storage and grid infrastructure to meet more variable supply, instead of relying only on supply moving to meet demand. The potential already exists and is growing: industrial processes that can shift, electric vehicles that sit plugged in for hours, heat pumps and thermal storage, and batteries on the grid and behind the meter. Conventional plants and grid assets also hold flexibility that contracts and static limits leave unused.

The challenge is to mobilise these resources to raise the utilisation of existing assets and new investment, so that reinforcement and peaking capacity can be deferred or avoided. The end-state is a grid where a material share of connected resources responds to system needs, smoothing peaks, absorbing surplus renewable output and providing services that once came almost exclusively from thermal power plants. 

Flexibility delivers most value when planning, connection, participation and operation evolve together. Operators can only call on the flexibility of the resources that regulation, market rules or programme rules allow to take part. Resource owners invest in flexible capability where that is required or rewarded, through standards, markets, procurement frameworks, direct control programmes or better connection terms. Planners can only rely on flexibility as an alternative to reinforcement once operators have demonstrated they can call on it reliably. Where one of these moves ahead of the others, flexibility potential goes underutilised. 

How to leverage this opportunity

Flexibility typically develops from the bulk system and the largest flexible resources towards dynamic operation across all resources. A flexible grid depends on the other accelerators: on the forecasts and data of a digital grid, on the interoperable equipment that can act on signals, and on aligned incentives for grid users and grid companies. The distributed grid accelerator extends these frameworks to millions of smaller resources at distribution level.